14 October 2019

2. Stage 1-October to November 2019 G Support Construction

With the plan decided upon construction began in earnest on the track bed supports all the way along the fence on the lower level and up to the corner on the upper.





The upper level had a bridge incorporated to get it to the corner.  This has subsequently been removed due to a bend in the deck being discovered during track laying.