Re-Configuration Construction Logs

 

The construction of the railway mainline began in August 2019.

See Mainline Construction Logs for the construction.

I decided to reconfigure the layout and make it “point to point’ instead of a pair of loops. to give me more shunting and running options as opposed to just running trains chasing their tails which become rather boring.

This page lists the construction of the railway re-configuration.  Links to posts about each milestone in the construction reached, which summarises what has been done, are listed below so that the construction can be easily followed. 

They are an ongoing record of developments on the railway.

 1. 14 January 2024 Work Begins on new Loops

 2. 18 January 2024 Area for the Indoor Section cleared

 3. 02 March 2024 Dismantling the Outside Loop

4. 4. March to July 2024 Sewer Access Hole 

5. 5. October 2024 The Upper Level Track heads into the shed.  

6. 6. 19 December 2024 The Upper Line enters the Shed. 

7. 7. 15 January 2025 The Lower Line reaches the Shed on both sides 

8. 8. 10 January 2025 Construction of the Lower Loop through the Shed begins   

9. 9. 31 March 2025 Construction of the Lower Loop Baseboards through the Shed is finished 

10. 10. The Ethanol and Sugar Sidings 

11. 11. 16 April 2025 The Gravel Pit Siding 

12. 12. 19 April 2025 The Loop through the Shed is Finished

13 13. 25 July 2025 Ringbalin is now Complete

14 14 12 May 2026 Branyan Yard is now Complete

15. 15. 12 May 2025 The Turntables 