Re-Configuration Construction Logs

 

The construction of the railway mainline began in August 2019.

See Mainline Construction Logs for the construction.

I decided to reconfigure the layout and make it “point to point’ instead of a pair of loops. to give me more shunting and running options as opposed to just running trains chasing their tails which become rather boring.

This page lists the construction of the railway re-configuration.

As each milestone in the construction is reached I will write a new post which summarises what has been done, they will be an ongoing record of developments on the railway.

Links to these posts have been placed on this page below so that the construction can be easily followed.

 1. 14 January 2024 Work Begins on new Loops

 2. 18 January 2024 Area for the Indoor Section cleared

 3. 02 March 2024 Dismantling the Outside Loop

4. 4. March to July 2024 Sewer Access Hole 

5. 5. October 2024 The Upper Level Track heads into the shed. 