"Cane Line" Construction Logs

The construction of the railway Cane Line and Mill Precinct began in April 2021. 

I have divided the construction  into 2 separate stages.

Stage 1; the sugar mill precinct (buildings) and track around the mill yard

Stage 2;  the line out to the "Farms" area and return loop.

As each milestone in the construction is reached I will write a new post which summarises what has been done, they will be an ongoing record of developments on the railway.

Links to these posts have been placed on this page below so that the construction can be easily followed. 


Stage 1
 
 

 
Stage 2
 
 
 

 


No comments: