This page shows the track plans of the railway as it has evolved over the period from August 2019 to the present day.
July 2020 |
December 2020 |
A second layout "the Cane Line" is planned which will have a sugar mill as its centrepiece, it will be made using Code 250 track.
February 2021 |
The "Cane Line construction has begun with the "Farms" loop and a run to the Mill Precinct completed.
Next part will be the Mill Precinct and the interchange track, the proposed loops may change depending on space.
December 2021 |