"Scenery" Construction Logs

As each milestone in the scenery construction is reached I will write a new post which summarises what has been done, these posts will be an ongoing record of scenery developments on the railway. 

Links to these posts have been placed below so that the construction can be easily followed.

I have also included a link to a post that describes the use of Acrylic House Render to construct my scenery.

Using House Render to make Cliffs/Cutting Walls

Construction posts;

4 December 2020 Grassy Bank/Hillside  

6 December 2020 Meadow and Rocky Riverbed under Trestle Bridges  

17 November 2022 Constructing a Backdrop to Hide Back Fence 

1 January 2023 Upper Level Backdrop Scenery 

20 January - 08 February 2023 Constructing the "Embankments" 