Ringbalin Light Railway G Division

The Ringbalin Light Railway G Division is a Large Scale/G/Garden model train layout (trains running on 45mm track) located in Bundaberg QLD Australia. It consists of two layouts; the "Mainline" and the "Cane Line" that operate independently of each other but do connect via an interchange line.

  • About the Railway
  • Track Plans
  • Latest Posts
  • "Mainline" Construction Logs
  • Re-Configuration Construction Logs
  • "Cane Line" Construction Logs
  • "Scenery" Construction Logs

16 December 2019

3. Stage 1-November to December 2019 G Lower Level Around the Corner

Track support for the lower level has been built around the corner and down the side fence.



















Back to Construction Logs


at December 16, 2019 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Landscaping

  • Home

HOME

  • Home

Search This Blog

GETTING STARTED and LINKS TO USEFUL SITES AND FORUMS

  • How I started in Model Trains
  • Links to Useful Sites & Forums Used for Ideas and Help

LOCOMOTIVES

  • Bachmann Spectrum 55 Ton 3 Truck Shay
  • Bachmann 2-8-0 Consolidation (Connie)
  • LGB Side Rod Diesel "Original Build"
  • 0-6-0 Sugar Cane Loco from an LGB Side Rod Diesel
  • Sugar Cane Tank Engine from an LGB Stainz
  • LGB Shorty Loco ex "Peanuts"
  • Sugar Cane Train Diesel
  • LGB 2076 "Stumpy":- The Original Build
  • LGB 2076 "Stumpy":- The Overhaul
  • Railmotor
  • Gravel Train
  • "Ruby"

ROLLING STOCK

  • Passenger Coaches
  • Wooden Flat Wagons
  • Sugar Cane Bins
  • Sugar Cane "Whole Stick" Wagons
  • 1:20.3 Rolling Stock (Scratchbuilt)
  • Hunter Valley Coal Hopper

ELECTRONICS and COMPUTER Related Pages

  • Radio Control & Motor Control Methods
  • Reconfiguring/Repackaging a 2.4GHz transmitter to control 4 locos
  • Simple Inexpensive Servo Controller
  • Wifi control of Points and Signals
  • Train Point Setting Board
  • Using a Raspberry Pi for WiFi Control of Points

Landscaping

  • Turfing around the Railway

FIRST GARDEN RAILWAY

  • Ringbalin Railway Mk 1 Part 1
  • Ringbalin Railway Mk 1 Part 2

Blog Archive

  • ►  2025 (7)
    • ►  April 2025 (4)
    • ►  January 2025 (3)
  • ►  2024 (7)
    • ►  October 2024 (4)
    • ►  March 2024 (1)
    • ►  January 2024 (2)
  • ►  2023 (5)
    • ►  February 2023 (1)
    • ►  January 2023 (4)
  • ►  2022 (2)
    • ►  December 2022 (1)
    • ►  January 2022 (1)
  • ►  2021 (7)
    • ►  December 2021 (3)
    • ►  April 2021 (4)
  • ►  2020 (25)
    • ►  December 2020 (1)
    • ►  November 2020 (1)
    • ►  September 2020 (1)
    • ►  July 2020 (4)
    • ►  June 2020 (5)
    • ►  May 2020 (6)
    • ►  April 2020 (2)
    • ►  March 2020 (2)
    • ►  January 2020 (3)
  • ▼  2019 (3)
    • ▼  December 2019 (1)
      • 3. Stage 1-November to December 2019 G Lower Level...
    • ►  October 2019 (1)
    • ►  August 2019 (1)
Simple theme. Theme images by Xaviarnau. Powered by Blogger.