25 June 2020

1. Stage 3-June 2020 Stage 3 is Commenced

Stage 3 has been started.
The first task was concreting in the posts that will hold the track baseboards for the upper and lower loop tracks.
They have been made longer than usual, so that the planned spiral/helix that will take the loop that "came down" in stage 1 back up to the upper level, can be mounted on them.  They will be trimmed after the spiral/helix is correct; this will be a complex build so extra time will be allocated to its construction.

This area is where the planned "town/industrial will be situated with a few sidings to provide some shunting interest included.


Looking toward back fence


Looking toward Stage 2


Looking toward shed
The proposed "sugar cane railway" will be built with the mill on the Left Hand Side of this picture and the rail running out to about where the dirt pile is.  