9 July 2020

4. Stage 3-July 2020 Lower Loop Baseboards are Installed

The baseboards for the Lower Loop running through Stage 3 have been installed, this now allows me to lay track to complete the Lower Loop so I can run a train continuously.
Once they are painted track laying can commence.





There is still some more work to be done to fill in the "town area" with more base boards.
The area under where the Upper Loop will run has been left vacant and will be filled in after the upper loop is finished.

Back to Construction Logs

No comments: