4. Stage 4 18- February 2021 Mainline Line Landscape Completed

Around the back of the mainline there was a patch of earth in front of my shed roller doors that kept getting overgrown with weeds.

This was creating unnecessary work so to eliminate that, I laid weed control mat down then covered it with "cracker dust" (a type of crushed rock) then ran a compactor plate over it to compress it.

I then sprinkled dry cement dust over the compressed dust then lightly misted it, this caused the cement to set and hold the dust in place.

This provides me with a walkway around the back of the mainline layout so I can access one of my shed doors and the battery compartment.

 