14 January 2024

1.14 January 2024 Work Begins on new Loops

 Work on rearranging the shed to clear space for construction to begin started at the beginning of the New Year.

The work nook I had for modelling was disassembled and an area on the main workshop bench was cleared.  My soldering bench was moved to the end of the main bench.  

This gave me an opportunity to downsize and dispose of some tables that weren't needed and de-clutter.

This gave me an open area along with the old HO area in which to build the loops and sidings dimensions 5.3M x 4M.  .

The work nook before.


 Work Nook Empty

New Modelling Area


 Soldering Bench


 Old HO area


 Looking out at layout from HO area.



 

 

 

 

 

 

 

 

 

 

 

 

 

 



 

No comments: