The High Trestle was completed, the Low Trestle was installed
Baseboards across the back fence and down the side fence were installed.
The silver bridge was removed after it was discovered that the deck was bent in the middle which gave a 21mm height difference between the middle and one end, plus while I was looking at it from a scenery point of view I could not think of a reason for it to be where it was.
Silver bridge that was removed |
Baseboards down side fence |
Down hill baseboard along side fence |
After the installation of the baseboards they were painted with a paving paint and then the track was laid down.
Tracks across the Back Fence with Silver Bridge removed |
Tracks down side fence |
I used the two largest Locos I have, a Bachmann 2-8-0 Consolidation (it has the biggest overhang) and a Bachmann 55 Ton 3 Truck Shay, for the High Trestle and my Cane Diesel and Side Rod Diesel for the Low Trestle all performed flawlessly.
This justified the extra time I took to get the track just right across the bridges.
Checking the High Trestle track |
2-8-0 Consolidation |
3 Truck Shay |
Cane Diesel checking the Low Trestle |
Side Rod on Low Trestle |
Drama unfolds between the trestles |
Skippy watches on |
No comments: