4 May 2020

1. Stage 2-May 2020 Stage 2 Begins - across the yard

Construction of Stage 2 has begun!!

It involves bringing the two tracks at the end of the downhill running around through some curves, with radii of 1.5M (5 Foot) inside and 1.8M (6Foot)outside, and then across the yard into the "town area.
This will create a loop, the inside of which will be accessed via a lift up bridge hinged at one end.

As there are no fence posts to attach to I have had to cut my own and concrete them in, they are made of galvanized "C" purlin (used to build sheds etc).


Benchwork Inside View showing future garden bed


I used a piece of lattice screening that was on my back deck before it was renovated, to provide a finished edge to the railway when viewed from the house. 
The lattice provides a shady spot behind it for shade loving plants.  A garden bed has now been built in front of it with a Frangipani Tree as focal plant.

Lattice Screen
Back to Construction Logs

No comments: