2 March 2024

3. Stage 6 - 02 March 2024 Dismantling the Outside Loop

 Dismantling of the loop that crosses the front of the shed is well underway.

While dismantling of the right side, looking from the shed, was being done a sewerage access hole was discovered right where a new post was going to go.

After contacting the local council engineering department it was deemed that a the realignment of the benchwork was needed so it did not cover the access hole.  They will be coming out to adjust its height so it is at ground level.

The upshot of this is that the lower bench in the shed will have to be longer which will give extra track length so it is not all bad.

Looking from Shed prior to Dismantling.

Access Hole and existing bench

Access Hole with Post

Access Hole

New Bench Alignment

 The new bench will be narrower than the previous one but will still be wide enough for 3 tracks.