2 March 2024

3. 02 March 2024 Dismantling the Outside Loop

 Dismantling of the loop that crosses the front of the shed has been done.

It went from this;




To this;

Left Side looking from shed

Right Side looking from shed

Where the old loops were

Left Shed Door looking from layout

 
Right Shed Door looking from layout

 

18 January 2024

2. 18 January 2024 Area for the Indoor Section cleared

The wall that separated the two parts of the shed has been dismantled and I now have a clear space to work in (a blank canvas so to speak).

The plan at the moment is to continue the two levels of the layout into the shed with a fairly steep grade on the upper level and a modest grade on the bottom level, the height difference is added to by the shed floor being higher than ground level.

To achieve this I to used the existing HO benchwork, which I extended and removed the expanded areas that were needed to give the required radius for my HO locomotives.

The benchwork is 1320mm high and the upper level outside is 1000mm high while the lower level outside and the shelving inside is 900mm.  

At 900mm I will be able to fit my storage shelving underneath it, moving the shelving will then allow me to open the door that is blocked off at the moment.

The backdrop of the HO layout will be retained and a mine building is being trialed in the corner. with a line running through it, this will give me a purpose for the coal hoppers that I have just 3D printed.

Hunter Valley Coal Hopper 

The mountain hiding the steel framing post "Post Mountain" is going to be retained but will need trimming and the tunnel entrance facing the door filled in. The other end of the tunnel may be left in place and a small railway run from it to to the mine.  An O Gauge loco and skips 3D print files are waiting to be done if that goes ahead.

Left Hand End of the Shed

Looking into Old Work Nook Area

Looking into Left Hand End Corner

 
Benchwork from Shed Door including Post Mountain

Looking along HO Benchwork


Coal Loader/Mine in Corner



14 January 2024

1.14 January 2024 Work Begins on new Loops

 Work on rearranging the shed to clear space for construction to begin started at the beginning of the New Year.

The work nook I had for modelling was disassembled and an area on the main workshop bench was cleared.  My soldering bench was moved to the end of the main bench.  

This gave me an opportunity to downsize and dispose of some tables that weren't needed and de-clutter.

This gave me an open area along with the old HO area in which to build the loops and sidings dimensions 5.3M x 4M.  .

The work nook before.


 Work Nook Empty

New Modelling Area


 Soldering Bench


 Old HO area


 Looking out at layout from HO area.



 

 

 

 

 

 

 

 

 

 

 

 

 

 



 

8 February 2023

20 January - 08 February 2023 Constructing the "Embankments"


Due to ground subsidence
(possibly where a tree was removed 3 years ago) an area of my baseboard sagged by about 30mm or more, this led to a large dip in the track with wagons uncoupling as they passed over the high points at either end and rainwater ponding in the low points in the centre.


The Sag Amount (the rail is level)

Initially I thought I was faced with the prospect of digging up the centre supporting posts and raising the base board to level it off.  

Further inspection revealed that the lattice frame supporting the area had bowed in the middle due to the centre supports sinking so the whole section would require replacement.  This looked like turning into a major bit of work.

Lattice section that sagged

After a bit of thinking I came up with the idea of leaving everything in place and building  an embankment using concrete render across the area which would raise the track and make the it level.

This is how I did it;

I started by obtaining a level for the track using a couple of string lines I then leveled up the track using spacer blocks.




 This now let me draw the outline of my embankments

 


Brown areas for a dry creek bed
Green areas for artificial turf
Red areas for embankments built from acrylic render
Using House Render

To save the amount of render needed and to reduce the weight I put in a couple of low bridges this will allow the water to run under the track and into drainage hole drilled through the baseboard.  In these holes I put in some wicks to break up the water surface tension at the side of the holes and allow the water to flow down them into the garden below.

Bridges 

For the bridge abutments I used builders vinyl moulding.

Vinyl Bridge Abutment

To give a bit of character to the bridges I decided to make some veneers to attach to the abutments to give a stone look.

Bridge Abutment

Stone Texture Detail

These were drawn using Tinkercad, the stone texture design came from the shapes library Community area in Tinkercad (search "stone wall").
The design is for a castle but I just "cut" the crenellations off.
There is another without mortar that can be found by searching "brick wall" in the same area

For the piers which will hold the aluminium track support beams I designed them in Tinkercad and 3D printed them.

Pier Front View

Pier Oblique View

To support the rail I fitted rail supports made from 10mm aluminium U shaped channel fitted to the abutments and piers by cutting channels in them to allow them to slot in.

Bridge Rail Supports

Bridge Rail Supports

Bridge Rail Supports

Bridges with track laid


 

Close Up of Pier with Track laid

 Embankments

After the bridges were built the embankments were laid and shaped using Acrylic Render .


Render Embankment

Render Embankment with Bridge Rail Supports

Render Embankment with Bridge Rail Supports 

 Track re-laid

After the render had set and hardened the rail was put back and secured in place using screws.

 

Track re-laid
Track re-laid

Finalising the scene.

To finish off the scene Artificial Turf, Gravel and Ballast were laid.

Artificial Turf 

The artificial turf was bought at a discount store it came in a 3 metre roll 1 metre wide.

 





Gravel

The area simulating the "swamp/dry creek bed was painted with a tan coloured base coat of paint, onto this diluted exterior PVA glue was sprayed, then gravel was sprinkled over the area and finally another spray of PVA diluted with water with a few drops of dish-washing detergent added (sometimes referred to as "Wet Water") to break up the surface tension and allow the glue to run between the grave.

The "banks" of the creek were lined with larger sized  gravel to define the edge.

Creek Bed Painted

Creek Bank Close Up

Creek Bed Gravel



 Ballast

 The ballast I use is 7mm Blue Metal rock bought at a local landscape suppliers.

This is glued down using the same method as described above to lay the gravel.

 

Abutment showing Gravel and Ballast
 

Wicks

To carry water down through the baseboard at the low point holes were drilled through the baseboard and wicks put into them.  These allow the water drain away quickly to prevent ponding.

Wicks


Wick Close Up (LP= Low Point)

 Finished